Pound £8,850 A Ron Martin built Holmside Carlisle

Published date: December 7, 2019
  • Location: Carlisle, Cumbria, United Kingdom

Has a copper boiler with full up to date hydraulic and steam tests. This loco is in very good order and performs well. The price includes a driving truck with internal water tank for extra capacity. Years of written history and old tests etc are part of the package. Can been seen in steam and trialled before purchase. Please telephone for test run and any further information if required.

Contact seller Share

Useful information

  • Avoid scams by acting locally or paying with PayPal
  • Never pay with Western Union, Moneygram or other anonymous payment services
  • Don't buy or sell outside of your country. Don't accept cashier cheques from outside your country
  • This site is never involved in any transaction, and does not handle payments, shipping, guarantee transactions, provide escrow services, or offer "buyer protection" or "seller certification"

Related listings

  • 7 1/4 Thomas 2 part built
    7 1/4 Thomas 2 part built
    7¼" gauge locomotives and parts - Northwich (Cheshire) - January 25, 2020 Pound £1,700

    for sale 7 1/4 inch gauge thomas 2, to the rod burnley design. latest spring spec cast iron motion brackets done cylinder block, end covers, steam chest, top plate complete. bearing are 8 off SKF ball bearings with solid spacers im located in northwi...

  • American Switcher 2017
    American Switcher 2017
    7¼" gauge locomotives and parts - Leyland (Lancashire) - January 20, 2020 Pound £5,500

    A lovely example of a real work horse. This loco can be seen regularly pulling three coaches round our track at the lsme. Only selling due to another project. The loco is a freelance diesel hydrolic locomotive built in 2017. Any more information requ...

  • MJ 'Bagnall' Kit
    MJ 'Bagnall' Kit
    7¼" gauge locomotives and parts - Lincoln (Lincolnshire) - December 27, 2019 Check with seller

    SOLD A kit to build the locomotive comprising all castings, various materials and small parts, formed cab, rolled saddle tank, assembled chassis frame, drawings and a construction manual. There is a new AJB boiler built January 2015 with full certifi...